Fall River Police Station
2026 · 40,000 SF · 4 stories · with Bestech of Connecticut
@ Colin Furze - USA TODAY NETWORK via ReutersNon-traditional demolition of a four-story, 40,000 square foot wood and brick police station, in cooperation with Bestech of Connecticut.
The demolition was performed by crawler crane and excavator, with tight access along city streets and directly overlooking adjacent structures. Bestech handled the asbestos management while RSG provided the demolition expertise.
- Location
- Fall River, MA
- Year
- 2026
- Scope
- 40,000 SF · 4 stories
- Client
- Bestech of Connecticut
Other recent work

106 Hartwell Ave, Fall River
Brick and wood school department building brought down by crane, overlooking the neighboring structures.

Union Hospital, Lynn
Hospital and foundations removed, concrete crushed on site, and rough site prep for new senior housing.

Franco-American Veterans Club
Brick and wood function hall: asbestos abatement coordinated, building and foundation removed, backfilled and rough graded. Now an after-school program facility.
Got a building that needs to come down?
Send the address and your schedule. We'll walk the site and get you a proposal. Quotes are always free.

